๐Ÿ’ธ Total Project Cost: $300-330 Million

This is one of the largest infrastructure projects in Woodbury history. To put it in perspective: this exceeds Woodbury's entire annual operating budget.

$150-200M
Treatment Plant
Permanent facility: 32M gal/day capacity. High-tech PFAS removal.
$100-130M
Pipeline Infrastructure
14-17 miles of new transmission lines. Construction, materials, labor.
$5-15M
Temporary Facility
Built 2020, operational through 2028. Fast-tracked emergency response.
"Several million" a year
Operating Costs
Filter media, staff, monitoring. City estimate; exact figure not published.

๐Ÿฆ Where the Money Comes From

3M Settlement ~93% (city estimate)
93%
Federal Funding $3.4M (1%)
1%
Gap & City/Residents $35-40M (6%)
6%
โš ๏ธ The Funding Gap: Despite 3M's $850M settlement (largest in state history), $35-40M remains unfunded. City is lobbying state for tax exemptions (HF 1529) to cover the gap. If unsuccessful, residents bear the cost through rate increases.

๐Ÿค The 3M Settlement: What It Covers

2018 Settlement Amount: $850 Million

Largest environmental settlement in Minnesota history. Funded by 3M's liability for groundwater contamination.

What It Covers

  • Capital infrastructure: treatment plants, pipelines and equipment (about 93% of Woodbury's project, per the city)
  • Operations, for now: the fund paid $3.3M in FY2026 to run temporary and permanent treatment systems across five cities, including Woodbury
  • Dispute: 3M is challenging whether some projects are "reasonable and necessary" under the 2007 Consent Order, and has asked for an independent review of spending

When It Runs Out

The state's October 2026 report puts the balance at $446.4M (June 30, 2026), with $133.4M planned for FY2027. It says capital costs ahead "surpass 3M Settlement dollars available" and that the fund will end "much sooner than previously anticipated." No end date is public.

$850M
3Mโ€“State of Minnesota Settlement (2018)
About $820M with interest | $446.4M left (June 2026) | Transition to the 2007 Consent Order is in mediation

๐Ÿญ The Ongoing Cost: Operations

Building the plant is a one-time expense. Running it is permanent. The city estimates it will cost "several millions of dollars annually." It hasn't published an exact figure.

What Operating Costs Include

  • Filter media replacement: carbon or resin is replaced on a cycle, and spent media needs specialized disposal
  • Staffing: operators and technicians
  • Monitoring: ongoing PFAS testing and reporting
  • Maintenance: equipment, pipelines and facility upkeep
โฐ A long-term commitment: PFAS doesn't break down. Treatment will be needed as long as it remains in the aquifer.

๐Ÿ“Š Impact on Resident Water Bills

Today

Woodbury's 2026 residential water rate is $10.20 per quarter plus $2.50 per 1,000 gallons (first tier). At 20,000 gallons a quarter, the water portion of a bill is about $60 a quarter. Sewer and stormwater are billed separately.

The city began "responsible utility rate changes" in 2024 to cover its under-$20M share of construction.

If residents pay to operate the plant

Conservative High
Annual operating cost $3M $6M
Added per household +$18/quarter +$51/quarter
Increase on the water portion +30% +85%

Note: This is our estimate, spread across 29,312 households (U.S. Census). The conservative case assumes homes pay 70% and businesses the rest; the high case assumes homes pay all of it. If the 2007 Consent Order covers operations, the added cost to residents is close to $0. Full method โ†’

โš ๏ธ Who Pays Most? A fixed dollar increase is a bigger share of income for lower-income and fixed-income households. No PFAS rate-assistance program has been announced.

โ“ Who Really Pays?

Now

  • 3M settlement: pays for construction and current operating costs
  • Residents: rate changes since 2024 cover the city's share of construction

When the fund ends

  • On paper: the 2007 Consent Order requires 3M to fund treatment for wells above health guidance
  • In practice: the terms are in mediation between the state and 3M
  • Possible outcomes:
    1. 3M covers operations under the Consent Order
    2. A negotiated split between 3M, cities and ratepayers
    3. 3M wins its disputes, and costs shift to water rates

๐Ÿ“ How Woodbury Compares

Other East Metro Communities

  • Hastings: about $68.9M for three treatment plants. The Star Tribune reported it had received about $14M from the settlement (2025).
  • Cottage Grove: all 12 wells exceed PFAS limits. A city official told the Star Tribune that if the money stops, "the only option would be to increase water rates."
  • Lake Elmo and Oakdale: received settlement grants in FY2026 for plant operations and planning.

Woodbury's $300โ€“330M project is one of the largest in the East Metro, serving more than 80,000 residents with 9 of 20 wells under health advisories.

The Biggest Question: Who Pays When the Fund Ends?

Construction is covered. Operations are covered for now. What happens next is being decided in mediation.

Next: The Settlement Gap โ†’